See elevations for locker base detail.
General drawing set notes for green roof.
General notes enlarged plans 1.
The replacement of the roof shall be conducted in such a manner as to protect the existing building and all of its contents in their entirety.
Location shown coordinate with mep drawings.
Green roof system provides insulation and reduces head load on the building which reduces heating and cooling demand respectively.
District no job address city zip note.
General notes for single family dwelling these general notes are provided as an aid and should not be construed as a complete list of requirements.
See roof plan general notes.
General notes general project information plan check no.
Refer to mechanical drawings for pipe penetration detail at roof.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Instructions the following notes must be included on the plans.
Provide guard rail roof plan general notes a.
As a note for vegetation the soil for a green roof should have a ratio of 70 percent inorganic material and 30 percent organic material.
Numbers in the parenthesis refer to sections of the 2017 edition of the county of los angeles green building standards code table t.
Low nutrients and lightweight substrates are a good combination for a green roof and its vegetation.
Waffle pad as specified in mep.
For additional clarity or for all other requirements please refer to the city of los angeles residential zoning and building codes.
This reduces the stormwater runoff peak discharge rate.
Provide a minimum roof r value of r 24 or greater.
General structural notes drawing list revisions 123 sets s1 10 structural cover sheet sheet no sheet title sheet total symbols and abbreviations for concrete as per aci general existing construction north 1 sd package 03 30 11 5 symbol legend structural abbreviations s2 10 foundation plan s5 01 foundation details s5 02 steel details s2 20.
See roof plan general notes.
Construction set 10 03 13 n o r t h w e s h o s i t a l 212021 00 a2 03 phase 2a part level 2 roof plan.
Provide tapered insulation as required to maintain a 1 4.
Set metal flange in roof insulation stagger all joints fasten per specification base ply concrete deck cant strip.
Refer to plumbing hvac and electrical drawings for information.
The types of plants that you will have will depend on the type of green roof you are installing.